Request the free feasibility study
From seven data points we will prepare your municipality's own figures.
Fill in the data formGREP carries out the full modernisation of a municipality's public lighting: from the survey and design through construction to operation for the entire contract term. The scheme is EPC-based: we finance the investment, and it is repaid from the energy savings achieved.

Savings from the first month after commissioning.
GREP finances the investment, which is repaid from the savings.
GREP is the borrower; the municipality only pays a service fee.
We install every technology that pays for itself economically.
A long-term solution, with noticeably better comfort for residents.
Products from major manufacturers, with operation until the end of the contract term.
Construction and fast fault repair with local specialists.
From seven data points we will prepare your municipality's own figures.
Fill in the data formWhat the service includes
The seven advantages explain why this scheme is better. The following explains exactly what we do on the municipality's behalf.
We prepare the municipality's electrical energy review and the feasibility study. The municipality does not pay for the lighting design either: it is part of our offer.
GREP is the borrower for the investment, together with its financing partners. The municipality takes on no loan and makes no upfront payment.
Installation is carried out by local contractors, with full technical documentation, so later fault repairs are also fast.
The risk of active component failure is borne by GREP, not the municipality. Fault reporting 24 hours a day: +36 80 980 071. Online fault reporting and information.
We represent the municipality in authority and utility matters concerning public lighting.
The savings can be taken not only in cash: further development of equal value can also be requested, such as more luminaires, denser lighting, decorative lighting, or pole replacement. Technology details →
Cable and pole reconstruction under the same scheme, as well as other electrical network installations: design, preparation, construction. Network development →
Send us the seven data points; the review is free of charge. From seven data points, we prepare your municipality's own figures.