EPC scheme for municipalities · since 2010
Reliable public lighting, guaranteed savings
LED public lighting modernisation with no municipal funding or loans.
Before
After
Our partners
Financial institutions, manufacturers and professional organisations
- ISO 9001
- ISO 14001
- MSZ 28001
- 100% carbon-neutral
- FBN-H member
Group data through 2024. Source: the GREP corporate group's reference list, as of March 2025.
Our motto
“There are many ways to cut a municipality's public lighting costs. For example, by turning off the lights!”
But is that really the optimal solution?
Our services
A scheme that pays off in seven ways
In the vast majority of European municipalities, the time has come for a full or partial modernisation of public lighting: most of the fittings in operation today are wasteful compared with current technical standards. GREP carries out the full modernisation of a municipality's public lighting: from the survey and design through construction to operation for the entire contract term. The scheme is EPC-based: we finance the investment, and it is repaid from the energy savings achieved.
- 01
Delivers results immediately
Savings from the first month after commissioning.
- 02
Requires no municipal funding
GREP finances the investment, which is repaid from the savings.
- 03
No risk for the municipality
GREP is the borrower; the municipality only pays a service fee.
- 04
Delivers the greatest possible savings
We install every technology that pays for itself economically.
EPC model
No funding required, with a guarantee
A modernisation defined by the EU as an EPC scheme, repaid from the savings achieved. We have been market leaders in EPC-type contracts since 2014.
- 1
Data collection
We assess the current public lighting based on seven data points.
- 2
Free feasibility study
A free electrical energy review, together with the design.
- 3
Contract and financing
GREP arranges and bears the financing. No loan, no upfront payment.
- 4
Construction
With local contractors, with full documentation.
- 5
Operation until the end of the contract term
Maintenance at a fixed price, with a 24-hour fault reporting line.
Details of the EPC model Technology: 70–85% less electricity
References
From Érd to Nemesborzova, with just 31 luminaires
From 24 luminaires to nearly nine thousand: we handed over a project every year between 2013 and 2024. The map shows GREP's reference municipalities in Hungary, with dot size proportional to the number of luminaires.
- Érd8,767luminaires · service contract · 2016
- Gyöngyös3,191luminaires · construction · 2020
- Jászapáti1,862luminaires · service contract · 2023
Recently on site
Not stock photos: our own work
A few recent photos from our installations. These 2025 installations are not yet included in the statistics above, which reflect the situation as of March 2025.


Our certifications
Certified quality, certified carbon neutrality
MSZ EN ISO 9001Quality management systemCertified by Marton Szakértő Iroda
MSZ EN ISO 14001Environmental management systemCertified by Marton Szakértő Iroda
MSZ 28001Occupational health and safety management systemCertified by Marton Szakértő Iroda
Carbon Free Company100% carbon-neutral companyiCC · BOCS Foundation · BCO-20210928-0127
FBN-H memberFamily businessFamily Business Network Hungary
Carbon Free Company certification based on an audit by iCC and BOCS Civilizációtervezés Alapítvány, certificate: BCO-20210928-0127 (October 2021). Our ISO certificates are issued by Marton. Details on the About Us page




